Delray Beach, Florida

Home Remodeling in Delray Beach

Kitchen, bathroom, and whole-home renovation for Delray Beach houses and condos. One crew, one point of contact, and a scope written down before anyone picks up a hammer.

Insured in Florida Owner-led on every project Palm Beach County since 2018
Why homeowners call us

One Team, Start to Finish

Delray Beach covers a lot of ground for a city its size. A 1920s cottage two streets off Atlantic Avenue and a 1990s house west of Swinton are different buildings with different problems, and they do not take the same renovation.

We take a small number of projects at a time so each one gets the owner's attention. The same crew runs the job from demolition through the final walkthrough, so nobody is learning your house twice.

Kitchens, bathrooms, and whole-home renovation, handled in house. We do not take small-repair or maintenance work.

Custom kitchen remodel with white shaker cabinetry, a black quartz waterfall island, and a statement hood A completed H&H kitchen renovation in Palm Beach County
At a glance

Remodeling in Delray Beach, at a glance

Permitting and historic district details confirmed against the City of Delray Beach's own published information, July 2026. Requirements change; we reconfirm current rules with the city on every project.
Service areaDelray Beach, FL, including the Old School Square, Marina, Del-Ida Park, Nassau Park, and West Settlers historic districts, plus Lake Ida, Tropic Isle, Seagate, and Pineapple Grove
ServicesKitchens, bathrooms, whole-home renovations, custom closets, built-in cabinetry
Not offeredSmall-repair, maintenance, and urgent-repair work
Permitting authorityCity of Delray Beach Development Services, Building Division, 100 NW 1st Avenue, (561) 243-7200. Plan review, permitting, and inspection of all construction activity. Building Division
Permit submissionsDigital. Delray Beach reviews plans through ePlans and takes applications, payments, and inspection requests through its eServices portal.
Historic districtsFive districts sit on the city's Local Register of Historic Places, and two are also on the National Register. Exterior work inside a district needs a Certificate of Appropriateness. City historic districts
HOA and condo boardsScope documentation and certificates naming the association; work sequenced around board meeting schedules, service elevator bookings, and building work hours
Typical timelineScope-dependent. A dated sequence is written into your estimate before work starts, and historic or board review is built into it rather than discovered later.
PricingFixed-price estimate written against a measured scope, not an allowance-driven placeholder.
InsuranceInsured in Florida. Certificates provided to HOA and condo boards on request.
Phone(561) 888-4488
What you get

Built the Way We Would Build Our Own

Every finish is treated as visible, whether you will see it or not.

One Accountable Crew

The same team from demolition to final walkthrough. You always know who is in your house and who to call about it.

A Scope, Not an Allowance

The estimate is written against a measured scope with selections made up front, so the number you agree to is the number the job is built to.

Review Built Into the Schedule

Historic, association, and city review each run on their own calendar. We sequence around them from the start rather than pausing the job to wait.

Respect for an Occupied House

Dust control, a protected path in and out, and a work area that closes down at the end of the day. Most of our projects happen in houses people are living in.

Finish Work That Holds Up

Tile, trim, and cabinetry are where a renovation is judged. Those go to the people who do them well, not to whoever is free that week.

Insured, and Documented

Insured in Florida, with certificates provided directly to your association or property manager when a building asks for them.

Local knowledge

What a Delray Beach Renovation Actually Involves

The parts of the job that are specific to this city, and that decide whether a project runs on schedule or stalls waiting on someone else's calendar.

Two approvals that run on separate clocks

A building permit and a historic approval are not the same thing and do not come from the same place. Construction permitting runs through the Development Services Building Division, which handles plan review, permitting, and inspection. If the property sits in one of the city's historic districts, exterior work also needs a Certificate of Appropriateness, which is a Historic Preservation Board matter.

Those two tracks have different submittals and different calendars. The mistake we see is treating them as one step, discovering the second one late, and losing weeks. On a Delray project we identify at the walkthrough which tracks apply and sequence the schedule around both.

The historic line runs along the exterior

This is the single most useful thing to know if your house is in a district, and most homeowners have it backwards. A Certificate of Appropriateness governs exterior improvements and alterations. A kitchen or bathroom renovation that stays inside the existing envelope generally is not what that review is aimed at.

What pulls a project into it is touching the outside: changing a window or a door, altering an opening, or adding on. That matters for a remodel more often than you would think, because the moment a design wants more daylight in a bath or a wider opening onto a terrace, the job has changed category. We flag that during design, not after demolition.

Whether your address is actually in a district

Five historic districts sit on the city's Local Register of Historic Places, and two of those are also on the National Register. They are West Settlers, Old School Square, Del-Ida Park, Nassau Park, and Marina.

District boundaries do not follow the lines people assume, and being near a district is not the same as being in one. The city publishes a Local Register map and a historic GIS map, which is the way to confirm a specific address rather than guessing from the neighborhood name. We check it before writing a scope, because the answer changes what the approval path looks like.

Permitting here is digital, and that cuts both ways

Delray Beach runs plan review through ePlans and takes applications, payments, and inspection requests through its eServices portal. Everything is submitted electronically.

For a homeowner that is mostly good news: the status of a review is visible rather than a phone call. It also means the drawings have to be right before they go in. A submittal that comes back with comments restarts a clock, so a complete package up front is what keeps a project moving.

Permit procedures, historic regulations, and building codes change. Everything above reflects the city's published information as of July 2026, and we reconfirm current requirements on every project.

Where we work

Delray Beach Neighborhoods We Serve

Single-family homes, historic cottages, condominiums, and estates across the city and the surrounding coast.

  • Old School Square Historic District
  • Marina Historic District
  • Del-Ida Park
  • Nassau Park
  • West Settlers
  • Lake Ida
  • Tropic Isle
  • Seagate
  • Pineapple Grove
  • Downtown Delray Beach
Primary bathroom with a black clawfoot tub, book-matched marble feature wall, navy double vanities, and a brass chandelier
Featured project

A Primary Bath, Rebuilt Around the Light

A full gut renovation: a freestanding tub set against book-matched marble, navy double vanities with backlit mirrors, and a tray ceiling that carries the room. Every surface was chosen before demolition started, which is the only way the stone lands the way it does.

Reviews

What Delray Beach Homeowners Say

5.0 average from 100+ Google reviews.

“From start to finish this was a 10 out of 10 experience. All communication and expectations were met beyond belief. The entire crew was professional, prompt and incredibly skilled. Not one decision was made without contacting the entire team and homeowners first. This experience for a full bath remodel was exceptional.”

Heidi CraigGoogle review

“Great company to work with. On time and meticulous. Clean up when they leave. Polite and thoughtful. Very professional. Fair pricing. Beyond happy with our built in bookcase surrounding our fireplace with window seats. We’ve had dozens of contractors work on our house. H&H beats them all.”

E. Cameron HitchcockGoogle review

“Tristan actually listened to what I wanted, and his crew delivered exactly what I envisioned. The attention to detail was incredible, the work was clean and efficient, and they finished everything quickly without cutting corners.”

Sierra GettierGoogle review

Verbatim excerpts from Google reviews. Read all reviews on Google

How it works

From First Call to Final Walkthrough

1

We visit the house, measure, and talk through what is not working about the space you have.

2

We confirm whether the property sits inside a historic district and what review the project will need, before anything is priced.

3

You get a written scope and a fixed estimate. No allowances that quietly grow once the job starts.

4

We finalize selections together: cabinetry, countertops, tile, fixtures, and lighting.

5

We handle the permitting process and prepare the approval packet your building, HOA, or the city requires before work starts.

6

Demolition begins on a scheduled date, with protection laid through the path our crew will use.

7

Rough-in and inspection, then cabinetry and finish work, in that order and inspected at each stage.

8

Final walkthrough together. We do not call it done until you do.

Common questions

Delray Beach Remodeling Questions

Do I need city approval to remodel a house in a Delray Beach historic district?

It depends on whether the work touches the outside of the building. A Certificate of Appropriateness covers exterior improvements and alterations to properties inside a designated district, and for a single-family or duplex that review is the Certificate itself. An interior kitchen or bathroom renovation that stays within the existing envelope generally is not the target of that review, but changing a window, a door, or an opening is. We identify which applies before the scope is written.

How do I know if my Delray Beach home is in a historic district?

Check the map rather than the neighborhood name. The city keeps five districts on its Local Register of Historic Places, West Settlers, Old School Square, Del-Ida Park, Nassau Park, and Marina, and publishes a Local Register map and a historic GIS map showing the boundaries. Being near a district is not the same as being in one, and the boundaries do not always follow the streets people expect.

How does permitting work in Delray Beach?

The city's Development Services Building Division handles plan review, permitting, and inspection of construction activity, and submissions are digital. Plans go through ePlans, and applications, payments, and inspection requests run through the eServices portal. We handle the permitting process and carry the review and inspections through the project, so you are not tracking it yourself.

What kind of projects do you take in Delray Beach?

Kitchens, bathrooms, and whole-home renovations, plus custom closets and built-in cabinetry as part of a larger project. We do not take small-repair, maintenance, or urgent-repair work. Keeping the project list short is what lets the owner stay on every job rather than rotating between them.

How do you price a project?

A fixed-price estimate written against a measured scope, with selections made before the number is set. Allowance-driven pricing is the usual reason a renovation ends well above where it started, so we would rather spend the time up front and give you a figure that holds.

Are you insured?

Yes. We are insured in Florida, and we provide certificates directly to your association or property manager when a building asks for them before work begins.

Let's Talk About Your Delray Beach Project

Tell us what is not working about the space you have. We will walk it with you, confirm what review the project needs, and put a real scope and a real number in writing.