A bathroom remodel that moves plumbing, alters electrical, or changes framing needs a permit and the associated sub permits. In Boca Raton, that path runs through the City of Boca Raton: apply in Boca eHub, upload plans in Boca Eplans (ProjectDox), clear plan review, then schedule inspections.
This guide is informational. It summarizes what the City of Boca Raton publishes about the permit process and common bathroom-related checklists. Exact requirements depend on the project, so confirm the document list and process with your contractor and the City of Boca Raton before you apply. For the remodeling service itself, see H&H’s bathroom remodeling in Boca Raton page.
How Boca Raton’s permit system works
The City of Boca Raton Building Department uses a two-part system, described on its Permit Process Information page:
- Boca eHub — apply for the permit, check status, pay fees, schedule inspections, and search public records.
- Boca Eplans (ProjectDox) — upload permit files for plan review (including the application generated when you applied), review comments, and download approved files after issuance.
The city’s Building Permits and Inspections page points applicants to the same tools: apply online, ePlans login, permit history, fee estimator, and application checklists for one- and two-family work.
To find the plumbing fixture checklist, use the city’s Application Checklists, then One & Two Family, then Plumbing Piping/Fixtures. For many bathroom remodels that stay inside the house, the matching building list is Interior Alterations.
Which checklist fits a bathroom remodel?
Interior-only alteration
The city’s Interior Only Alteration permit submittal checklist is the usual path when the work is inside the building. It calls for:
- Contractor registration (contractors must be registered and current to pull permits; owner-builders use the owner-builder requirements)
- An initial deposit of 1% of the contract value, with a minimum of \$100.00 for the first \$500 of the contract; remaining balance due upon issuance
- Subcontractor applications before permit issuance
- Required forms that commonly include a Submittal Form, Building Application, and Electrical, Plumbing, and Mechanical applications when those trades are in scope, plus Authorized Agent Form and other sheets as listed
- Contract and plans; electrical load calculations when required
- A certified Notice of Commencement (NOC) on building permits with a value greater than \$5,000 (the same checklist notes a higher threshold for certain mechanical AC changeout permits)
A bathroom that relocates a vanity, shower, or toilet, opens a wall, or adds circuits usually lands here—not on a paint-and-fixtures-only assumption.
Plumbing piping / fixtures
When the scope is primarily plumbing (new piping, relocated fixtures), the city’s Plumbing Piping/Fixtures checklist applies. Reach it through Application Checklists → One & Two Family → Plumbing Piping/Fixtures. It still requires contractor registration, the same style of initial deposit, subcontractor applications before issuance, a plumbing application and authorized agent form, contract and plans, and a certified NOC on building permits valued over \$5,000.
Many full bathroom remodels need both the building (interior alteration) path and the plumbing sub-trade paperwork. Follow the checklist that matches the actual scope; do not guess from a blog post.
Owner-builder rules in Boca Raton
If you want to pull the permit yourself as an owner-builder, the city’s Permit Process Information page sets hard limits:
- The property must be a single-family home
- You must be listed as the owner; the property cannot be owned by a business
- You must currently live at the property (not rent it out)
- Sections 7 and 8 of the permit applications must be signed and notarized by the owner, regardless of job value
- Sub-permit applications for the scope must be completed by the property owner; applications filled out by a contractor will not be accepted for that owner-builder path
Condo and investment properties often fail these tests. When owner-builder is not available, a registered contractor pulls the permit.
What to gather before you apply
Use the city’s checklists as the source of truth. In practice, bathroom remodel packets usually need:
- A clear scope and signed contract
- Plans that show existing and proposed layouts, plumbing, and electrical as required
- The correct trade applications for every subcontractor
- Replacement Data Sheet, where the checklist lists it
- A plan for recording and posting a Notice of Commencement when the building permit value is over \$5,000
- Access to Boca eHub for application and fees, and Boca Eplans for file upload
The city’s Building Permits and Inspections page also links application forms, video tutorials, ePlan information, and FAQs on submittal, plan review, inspections, and closeout. Start there if you are unsure which form set to open.
How this relates to county kitchen permits
City of Boca Raton rules govern work inside Boca Raton. Unincorporated Palm Beach County and other cities use different portals and exemption lists. For the county-focused kitchen overview (separate topic, separate jurisdiction), see Kitchen remodel permits in Palm Beach County.
Confirm with your contractor and the city
Permit rules, document lists, fees, and review timing depend on the project. Use this article as a map to the city’s published pages—not as a substitute for the checklists or for advice from your contractor and the City of Boca Raton Building Department.
When you are ready for the remodel itself—not only the paperwork—start from bathroom remodeling in Boca Raton or the broader bathroom remodeling overview.
Soft next step
If you are planning a bathroom remodel in Boca Raton, request a consultation with H&H Signature Renovations, or call (561) 888-4488. Confirm every permit step with your contractor and the City of Boca Raton for the scope you actually have.
FAQ
Do I need a permit to remodel a bathroom in Boca Raton?
A bathroom remodel that moves plumbing, alters electrical, or changes framing needs a permit and the associated sub permits through Boca eHub and Eplans. Use the city’s Interior Alterations and Plumbing Piping/Fixtures checklists for the exact document list, and confirm with your contractor.
What is Boca eHub vs. Boca Eplans?
Per the city: eHub is where you apply, pay, schedule inspections, and check status. Eplans (ProjectDox) is where you upload plans for review and download approved files.
When is a Notice of Commencement required in Boca Raton?
The city’s Interior Only Alteration and Plumbing Piping/Fixtures checklists both state a certified NOC is required on building permits with a value greater than \$5,000 (with a separate threshold noted for certain mechanical AC changeout permits).
Can I pull an owner-builder permit for a Boca bathroom?
Only if you meet every owner-builder rule on the city’s Permit Process Information page: single-family home, you are the listed owner (not a business), you live there now, and you notarize the required application sections yourself.
Where should I go for the remodeling work itself?
This article is about permits. For the service, see bathroom remodeling in Boca Raton.
Sources
- City of Boca Raton — Permit Process Information — https://www.myboca.us/1417/Permit-Process-Information
- City of Boca Raton — Building Permits and Inspections — https://www.myboca.us/157/Building-Permits-and-Inspections
- City of Boca Raton — Permit Submittal Checklist: Interior Only Alteration (PDF) — https://www.myboca.us/DocumentCenter/View/250/Interior-Only-Alteration-PDF-
- City of Boca Raton — Permit Submittal Checklist: Plumbing Piping/Fixtures (PDF) — https://www.myboca.us/DocumentCenter/View/269/Plumbing-Piping-Fixtures-PDF-
- City of Boca Raton — Application Checklists (One & Two Family path to Plumbing Piping/Fixtures) — https://www.myboca.us/157/Building-Permits-and-Inspections






