Bathroom Remodeling in Palm Beach Gardens
Primary suites, guest baths, and tub-to-shower conversions for Palm Beach Gardens homes, from PGA National and BallenIsles to Evergrene and Avenir.
A Bathroom Built Around Your Community's Rules
Many Palm Beach Gardens bathrooms sit inside a planned community with its own association, its own architectural rules, and often its own gate. The renovation has to satisfy that community and the city at the same time.
We run the whole project in house: design, demolition, plumbing, electrical, waterproofing, tile, glass, vanities, and finish carpentry. One crew and one point of contact carry it from the first measurement to the final inspection.
Our job is to make the paperwork invisible to you and the bathroom the only thing you have to think about.
A completed H&H bathroom renovation in Palm Beach County
Bathroom remodeling in Palm Beach Gardens, at a glance
| Service area | Palm Beach Gardens, FL, including PGA National, BallenIsles, Mirasol, Old Palm, Frenchman's Reserve, Evergrene, Avenir, Alton, and Steeplechase |
|---|---|
| Service | Full bathroom renovation: primary suites, guest baths, powder rooms, and tub-to-shower conversions |
| Not offered | Small-repair, maintenance, and urgent-repair work |
| Permitting authority | City of Palm Beach Gardens Building Division, 10500 N Military Trail, (561) 799-4210. Office hours Monday to Friday, 8 a.m. to 4:30 p.m. Building Division |
| Permit system | Palm Beach Gardens' online permitting portal. Applications, plan review, payment, and inspection scheduling all run through it, and large plans are accepted as PDF files only. Community Development Portal |
| Remodel plan review | The city's residential remodel checklist routes plans through the building trades and through Development Compliance. An HOA approval letter is required when the plan reviewer asks for one. Permit Info Guides |
| Inspections | Booked through the Palm Beach Gardens portal. Requests made between 8 a.m. and 3 p.m. can be scheduled for the next day, and the final inspection opens only after earlier ones pass. |
| Inside city limits? | The city directs owners to the Property Appraiser's record: if the municipality field reads Palm Beach Gardens, the property is inside the municipal boundary. |
| Flood maps | New FEMA flood maps took effect December 20, 2024. The city points residents to Palm Beach County's flood zone lookup. |
| Typical timeline | Scope-dependent. A dated sequence goes into your estimate before work starts, with association approval and city review built into it. |
| Insurance | Insured in Florida. Certificates provided to associations and property managers on request. |
| Phone | (561) 888-4488 |
What Changes When One Team Owns the Bathroom
The details that decide how a bathroom looks in ten years are settled before the first tile goes up.
Waterproofing Detailed, Not Assumed
Shower pans, corners, niches, and every valve penetration are sealed and checked before tile. It is the part you never see and the part that matters most.
The Same Crew Throughout
No rotating subcontractors you have never met. The people at your gate on day one are the people at the final walkthrough.
Association Timing Planned In
Architectural review, gate access lists, and contractor hours are handled up front, so demolition starts when approvals are already in hand.
Selections Before the Price
Tile, stone, fixtures, and glass are chosen before we set the number, so the estimate describes the bathroom you are actually getting.
A Clean, Occupied Home
Floor protection along our path, dust control at the doorway, and a work area closed down neatly at the end of each day.
Finish Work at the Standard of the Room
Book-matched stone, frameless glass, and custom vanities go to specialists who do that work every week.
How a Palm Beach Gardens Bathroom Remodel Moves From Plan to Permit
What the city's own process means for a bathroom project here, and where the real delays tend to come from.
A Palm Beach Gardens address is not always a Palm Beach Gardens permit
A mailing address is not how the city answers the question of whether a home is inside its limits. Its planning FAQ tells owners to look up the property on the Property Appraiser's site and read the municipality field. If it says Palm Beach Gardens, the home is inside the municipal boundary and the city's Building Division reviews the work.
If it names another jurisdiction, the permit, the forms, and the inspectors all change. We look up the parcel before we write a scope, because building a submittal for the wrong office is the kind of mistake that costs weeks and teaches nothing.
Your association's letter can become part of the city file
The Building Division's residential remodel checklist sends plans through two tracks: the building trades (structural, mechanical, plumbing, gas, electrical) and Development Compliance. That second track checks construction plans against the city's land development regulations and the conditions of approval in any development order that applies to the property.
The same checklist lists an HOA approval letter, required when the plan reviewer asks for it. In a city where many homes sit inside master associations, we treat that letter as part of the submittal, not an afterthought. Getting the association's approval first means a reviewer's request is answered the day it arrives.
Plans are submitted as signed PDFs, and the signature matters
Palm Beach Gardens moved its permitting online. The city no longer takes printed documents larger than letter size, large plans go in as PDF files only, and every contractor has to register in the system.
Most bathroom remodels only need trade plans. When a project moves a wall or needs an architect's or engineer's drawings, the city requires those plans to be digitally signed by that professional, and it warns that a self-signed file can significantly slow processing. We confirm which documents a scope needs, and who signs them, before the package is assembled.
Inspections run in order, and the final waits on the rest
A bathroom collects inspections as it goes: plumbing rough-in, electrical rough, and equipotential bonding where it applies, all before the walls close. The city books them through its portal and states that the final inspection is only available once the earlier ones have passed.
That sequence is why our schedule has inspection dates written into it rather than hoped for. Requests made before 3 p.m. can be booked for the next day, so a well-run job loses very little time between stages. A missed inspection, on the other hand, can mean opening finished tile to show what is behind it.
Permit procedures and building codes change. Everything above reflects the City of Palm Beach Gardens' published information as of September 2026, and we reconfirm current requirements on every project.
Palm Beach Gardens Communities We Serve
Single-family homes, villas, townhomes, and condominiums across the city.
- PGA National
- BallenIsles
- Mirasol
- Old Palm
- Frenchman's Reserve
- Evergrene
- Avenir
- Alton
- Steeplechase
- Oaks East
- Paloma
A Primary Suite Rebuilt Around the Tub
A full renovation planned from the drain lines up: a freestanding tub set against a marble feature wall, fixtures placed to suit the new layout, and waterproofing detailed long before the stone went on.
Recent Bathroom Renovations





“From start to finish this was a 10 out of 10 experience. All communication and expectations were met beyond belief. The entire crew was professional, prompt and incredibly skilled. Not one decision was made without contacting the entire team and homeowners first. This experience for a full bath remodel was exceptional.”
“Great company to work with. On time and meticulous. Clean up when they leave. Polite and thoughtful. Very professional. Fair pricing. Beyond happy with our built in bookcase surrounding our fireplace with window seats. We’ve had dozens of contractors work on our house. H&H beats them all.”
“Tristan actually listened to what I wanted, and his crew delivered exactly what I envisioned. The attention to detail was incredible, the work was clean and efficient, and they finished everything quickly without cutting corners.”
Verbatim excerpts from Google reviews. Read all reviews on Google
From First Call to Final Inspection
We walk the bathroom with you, measure it, and talk through what the current room gets wrong.
We confirm the parcel's jurisdiction and what your association requires before it approves interior work.
You receive a written scope and a fixed estimate, with no allowances waiting to grow later.
Together we finalize tile, stone, fixtures, glass, vanity, and lighting.
We handle the permitting process and assemble the association approval and the city submittal.
Demolition starts on a scheduled date, with protection laid along the route our crew uses.
Rough-in and inspections, then waterproofing, tile, glass, and finish work, each stage checked before the next.
Final inspection and a walkthrough together. It is finished when you say it is.
Palm Beach Gardens Bathroom Remodeling Questions
Does a bathroom remodel in Palm Beach Gardens need a permit?
Usually, yes. The city states that a permit is required for most construction, remodeling, or repair work, and it lists plumbing, electrical, and mechanical work among the examples. A bathroom that moves a drain, adds a circuit, or replaces a shower valve almost always falls in that group. We confirm the exact scope with the Building Division and handle the permitting process.
My address says Palm Beach Gardens. Is the city definitely the one reviewing my project?
Not necessarily. The city tells owners to check the municipality field on the Property Appraiser's record for the parcel. If it reads Palm Beach Gardens, the city's Building Division reviews the work. If it names a different jurisdiction, that office does. We check it before we write a scope.
Will the city ask for my HOA's approval?
It can. The city's residential remodel checklist lists an HOA approval letter as required when the plan reviewer asks for it. Because many Palm Beach Gardens homes sit inside master associations such as PGA National, BallenIsles, or Mirasol, we get the association's approval lined up before the city submittal rather than waiting for the request.
How long does the city take to review a bathroom permit?
The city does not publish a fixed review time. It says review times vary with the complexity of the project and the disciplines involved, such as building, electrical, and plumbing. We put a dated sequence in your estimate and update it as review moves.
Can you build the bathroom so it still works as we get older?
Yes, and the time to decide is while the walls are open. Blocking for future grab bars, a wider door, and a low-threshold or curbless shower entry cost little at framing and a great deal once the tile is finished. We raise it during design even when nobody has asked.
Are you insured?
Yes. We are insured in Florida, and we send certificates directly to your association or property manager when a community asks for them before work begins.
Let's Plan Your Palm Beach Gardens Bathroom
Tell us what the bathroom you have gets wrong. We will walk it with you, confirm what your association and the city need, and put a real scope and a real number in writing.
